COST SUMMARY (MasterFormat)

DIVISION
MATERIAL
LABOR
EQUIPMENT
TOTAL
01 – General Requirements
03 – Concrete
04 – Masonry
05 – Metals
06 – Wood
07 – Thermal and Moisture Protection
08 – Openings
09 – Finishes
11 – Equipment
22 – Plumbing
23 – Heating, Ventilating, and Air-Conditioning (HVAC)
26 – Electrical
31 – Earthwork
32 – Exterior Improvements
GRAND TOTAL
$0.00
$0.00
$0.00
$0.00

COST SUMMARY (UNIFORMAT II)

Gross Floor Area
GSF =
2250tc={1DF46D86-5353-E143-91BC-ED3DDF311C2D}: [Threaded comment]Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924Comment: Input the correct area of the building
Division
Breakdown
$/GSF
Cost
A Substructure
A10 – Foundations
2.15
4,846.40

A20 – Basement Construction
B Shell
B10 – Superstructure

B20 – Exterior Closure

B30 – Roofing
C Interiors
C10 – Interior Construction

C20 – Stairs

C30 – Interior Finishes
D Services
D10 – Conveying

D20 – Plumbing

D30 – HVAC

D40 – Fire Protection

D50 – Electrical
E Equipment and Furnishings
E10 – Equipment

E20 – Furnishings
F Special Construction and Demolition
F10 – Special Construction

F20 – Selective Building Demo
G Sitework and Utilities
G10 – Site Preparations

G20 – Site Improvements

G30 – Site Civil/Mech. Utilities

G40 – Site Electrical Utilities

G90 – Other Site Construction
Z General Conditions, Overhead, and Profit
Z10 – General Conditions

Z20 – Other Indirect Costs

Z30 – Contractor’s Fees (Profit)
GRAND TOTAL

2.15
4,846.40

DIVISION 03 – CONCRETEtc={3C06DEBA-FDB8-8E44-AF88-8AD084E72A88}: [Threaded comment]Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924Comment: Copy as many division sheets as needed using this template

RS Means Item #
Uniformat II Code
Item Description
Unit
Qty
Unit Cost ($/unit)

Cost ($)

Total Cost ($)

Material
Labor
Equipment
Material
Labor
Equipment

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
GRAND TOTAL

0.00
0.00
0.00
0.00

QUALITY: 100% ORIGINAL – NO PLAGIARISM

(USA, AUS, UK & CA PhD. Writers)

CLICK HERE TO GET A PROFESSIONAL WRITER TO WORK ON THIS PAPER AND OTHER SIMILAR PAPERS

The Best Custom Essay Writing Service

About Our Service

We are an online academic writing company that connects talented freelance writers with students in need of their services. Unlike other writing companies, our team is made up of native English speakers from countries such as the USA, UK, Canada, Australia, Ireland, and New Zealand.

Qualified Writers

Our Guarantees:

CLICK TO SUBMIT YOUR ORDER